00763nam a2200205 a 4500001001300000005001500013008004100028049001700069052001800086082001500104100004800119245009400167260005300261300003000314500008900344502004900433504004100482650002400523950001000547WDM20070080320201102083208070514s2005 us a 000 eng 0 lWM507057fDP02a624.25bH772l0 a624.252211 a홍태훈,g洪兌薰,d1973-0KAC20162253710aLife-cycle cost assessment model of composite materials in construction/dby TaeHoon Hong aAnn Arbor, MI:bUMI Dissertation Services,c2005 axx, 303 p.:bill.;c23 cm aSource: Dissertation Abstracts International, Volume: 66-08, Section: B, page: 4373.1 aThesis (Ph.D.) --bPurdue University,d2005. aIncludes bibliographical references. 4aEngineering, Civil.0 bUS$95